BioUltra
Summary
Category:
- Product Description
-
Equipment advantages
Comparison
Industrial Fermentation
Bioultra Intelligent Fermentation Stations
Benefits
Investment
70-140 thousand $
40 thousand $
40% lower cost
Construction
Needed
No need
80% faster deployment
Installation
≥3 month
No need
Run Cycle
3-5 day/batch
1day/batch
50% higher efficiency
Efficiency
20 billion cfu/mL
10 billion (3 days,30 billion cfu/mL )
Labor Input
Expert engineers
No expertise needed
Laber reduced 80%
Equipment parameters
BioUltra Parameters
Type No. DME-100 Connect Mode 4G / Wifi Size 390cm×200cm×250cm Net Weight 5000 Kg Rated Power 50 kW Voltage 380 V Batch Cycle 20 Hour / Batch Output Capacity 1000 Litre / Batch Dosage 10 Bag/Batch Culture Medium
Bacteria 5kg/bag Fungus 5kg/bag Nutrigen Fixing 5kg/bag Supportable fermentation strains
Application Key Strains BioUltra
Viable cells
(CFU/mL)Expansion
(Times)Biological Control Crops
CultivationCompound Bacillus ≥10 billion 2500 Soil Remediation、Disease Control、Growth-Promotion、 Crop Quality Improvement B. thuringiensis (BT) ≥2 billion 500 Pest Control: Cotton Bollworm, Corn Borer, Cabbage Caterpillar, Mosquitoes, Flies, Colorado Potato Beetle, Scarabs, Pine Caterpillar, Etc. Trichoderma harzianum ≥0.5 billion 125 Disease Control: Root Rot, Gray Mold, Powdery Mildew, Etc
Growth Promotion: Root Development, Enhanced Stress Resistance
Paecilomyces lilacinus ≥0.5 billion 125 Nematode Control: Root Knot Nematode, Cyst Nematode, Etc.
Pest Control: Aphids, Whiteflies, Thrips, Etc.
Soil-borne Disease Control: Damping-off, Blight, Etc.
Beauveria bassiana ≥ 0.5 billion 125 Pest Control: Cotton Bollworms, Corn Borers, Rice Leaf Folders, Potato Beetles, Scarabs, Aphids, Whiteflies, Pine Caterpillars Rhizobia ≥0.5 billion 125 Nitrogen Fixing、Growth Promotion、Crop Quality Improvement Associative Nitrogen-Fixing Bacteria ≥0.5 billion 125 Nitrogen Supply For Cereal Crops Fermentation process & operational steps
1-Step: Pre-Use Check
- Open the station's door and prepare the ladder, check the inoculation tray and fermentation tank inside to make sure they didn't have any residue there and were cleaned up before fermentation.
2-Step: Preparation
- Fill in strain agents (the inoculation tray) and culture medium (the fermentation tank) while wiping off the edge of the residue. Screw both lids to seal without air. Click the water inlet button to fill with water and stop it while the alarm is alerting.
3-Step: Startup
- Select the strain type(Bacteria/ Fungus/ Aerobic /Anaerobic) and scan the QR code to initiate the fermentation process. Experiencing 24hours, it will finish. At this time, untighten the fermentation lid to release some pressure under the tank. Then, press the discharge button on the screen. After out of discharge, press the discharge button again to stop.4-Step: Cleaning
- Screw the lids for both inlets. Press the clean button to start the cleaning process automatically. Then, remove the wastewater.
GREEN NITROGEN BIOTECH
Recommended Solution
Sharing of cutting-edge technologies and industry practices in on-farm one-step fermentation, insights into the latest trends in live microbial agriculture
Inquiry Me Now, Got The Price List